From the Treasurer, Ss Simon & Jude, Cockshutt – May 2023

The PCC (Parochial Church Council) have been applying for permission (a faculty) to upgrade the sound system in the church and to redecorate the inside of the church.  Because the church is a Grade 2 listed building all sorts of checks needed to be made.  These started before the lockdowns and, as a result, are still ongoing. Inspection of prospective work was finally carried out in March 2023, and when permission to proceed with the agreed work of replacing the old speakers and wiring is given, an application for a grant to do this will be applied for.

Also, the renovation of the war memorial is part of another grant application.

Best Wishes,

Mike

The above is part of the full Report from the Treasurer, 2022-2023, which was presented and approved at the APCM.  To read to the full report, please click this link.